A construction loan does not settle in one hit. The lender releases money in stages as your build progresses, and your plan for each stage matters as much as the loan itself.
For a Bulimba owner planning a new home, a knockdown rebuild or a custom design, understanding this staged process helps you protect your cash flow and avoid delays on site. This article explains how settlement works and what to line up before your builder sends the first claim.
How Does Construction Loan Settlement Work?
Construction loan settlement is the process where a lender pays your builder in stages as work is completed, instead of paying the full loan amount at once. If you are buying land as well, the land purchase generally settles before the build drawdowns begin, but check the sequence with your lender.
Each payment is called a drawdown. The builder issues a claim for the stage just finished, and the lender pays that amount against the loan. Lenders often require a progress inspection or other evidence of completed work before releasing funds, so check who arranges and pays for the inspection. Lender terms such as the number of drawdowns, inspection requirements and fees vary, so check these in your loan documents. If you are exploring construction loans, ask each lender how its drawdown process runs.
What Is a Progress Payment Schedule?
A progress payment schedule lists the stages of your build and the amount due at each one. In Queensland, the number and timing of payments are negotiated, but they must be relative to the work completed.
Queensland also sets limits that protect you. The maximum deposit is 5 per cent for contracts of $20,000 or more, or up to 20 per cent where off-site work is more than half the contract price. A builder cannot claim more than 50 per cent of the contract price, including the deposit, until at least 50 per cent of the on-site work is complete. Paying early or above the contract amount can reduce your protection under the Queensland Home Warranty Scheme, so keep payments aligned with finished work.
Why Interest Charged on the Amount Drawn Down Matters
Many lenders charge interest on the amount drawn so far rather than on the full approved loan. However, the repayment type during the build, and whether principal repayments start, is set by each lender, so confirm this in your loan documents.
Where interest is charged on the drawn amount, your repayments climb as the build progresses, so your budget needs room for the final stage. As an illustrative example at 6.75% p.a., a drawn balance of $400,000 costs about $27,000 a year in interest, or roughly $2,250 a month. If the drawn balance later reaches $800,000 at the same rate, interest-only repayments would be about $4,500 a month. Rates differ by lender and deposit size, so use our loan repayment calculator to test your own figures.
NSW Government guidance says a borrower financing a project home must begin repayments once the first progress payment is made. Check with your lender how this applies to your own loan.
Ready to get started?
Book a chat with a Finance & Mortgage Broker at DC Finance today.
A Scenario: Staged Drawdowns on a Bulimba Rebuild
Consider an owner who plans to knock down an older home and build a custom home on the same block. They hold a fixed price building contract with a registered builder and a staged payment schedule.
The situation: the owner assumes the lender will pay each claim as soon as the builder sends it. The builder's second claim arrives, but the lender wants a progress inspection first. Without this step planned, the builder waits several days and the owner worries about site delays.
The solution: the owner's broker had explained the inspection step at the start. The owner books the inspection as soon as the stage finishes, keeps the builder's invoice and the building contract on hand, and keeps a small cash buffer for any gap between claim and payment.
The outcome: the lender releases the funds after the inspection, the builder carries on, and the owner's interest charges rise only by the interest on that extra drawn amount. The lesson is that settlement runs on paperwork and timing, so confirm the process before the first claim.
Costs and Trade-Offs to Plan For
Construction loans may bring additional costs, such as inspection or drawdown fees, depending on the lender. Ask your lender for its fee schedule.
Building Commission NSW gives $250 to $500 as an indicative cost of each progress inspection in that state. Queensland costs may differ, so ask your lender who arranges inspections and who pays. The bigger trade-off is cost blowouts. If variations push the build above the contract price, you may need extra funds before the lender releases the final payment.
Serviceability and What Lenders Check
Lenders assess whether you can meet repayments before approving a construction loan. APRA's rules require authorised deposit-taking institutions to test new borrowers at an interest rate at least 3 percentage points above the loan product rate, and APRA confirmed this buffer remained in place on 28 May 2026.
For interest-only loans on residential property, APS 112 requires serviceability to be assessed over the term in which principal and interest repayments apply, excluding the interest-only period. In practice, this means the lender looks at what you can afford once the build ends and full repayments begin. A broker can help compare your borrowing capacity across lenders before you sign a building contract.
First Home Owner Grant When You Build
Queensland's First Home Owner Grant is $30,000 for eligible first home buyers building or buying a new home valued under $750,000 (including land), and it continues for eligible contracts signed from 1 July 2026. Eligibility rules apply, so confirm your situation with the Queensland Revenue Office or your broker before signing.
If you are a first-time buyer, our first home buyers page covers other support that may be available. You can also use the stamp duty calculator to estimate duty on the land purchase.
Tax Points for Investors Building in Bulimba
If you are building to rent out, interest on a construction loan can be treated differently from interest on a loan used to buy vacant land. The ATO states that holding costs for vacant land, including interest on money borrowed to buy the land, are not deductible while the land stays vacant. Interest on borrowings for the construction itself is not treated as a holding cost. Where one loan funds both, the interest must be apportioned. Your outcome depends on your circumstances, so speak with your accountant. See our investment loans page for the lending side.
Before you build, sit down with a local broker who understands construction funding. If you want to talk through your Bulimba project, visit our mortgage broker in Bulimba page. Call one of our team or book an appointment at a time that works for you, and we will map out your drawdown plan before the first claim arrives.
Frequently Asked Questions
How does construction loan settlement work?
The lender pays your builder in stages as work is completed, rather than releasing the full loan at once. Each stage is a drawdown, and lenders often require a progress inspection or other evidence of completed work first.
Do I pay interest on the full construction loan during the build?
Many lenders charge interest on the amount drawn so far, but the repayment type during the build, and whether principal repayments start, is set by each lender. Confirm this in your loan documents and budget for higher repayments as more is drawn.
Is there a limit on builder deposits in Queensland?
The maximum deposit is 5 per cent for contracts of $20,000 or more, or up to 20 per cent where off-site work is more than 50 per cent of the contract price. A builder also cannot claim more than 50 per cent of the price until half the on-site work is complete.
Can I deduct construction loan interest on an investment build?
The ATO treats interest on construction borrowings differently from interest on vacant land borrowings. Speak with your accountant about your own situation, as outcomes depend on your circumstances.